| dc.contributor.author | Seppänen, Olli | |
| dc.date.accessioned | 2026-08-20T10:39:15Z | |
| dc.date.available | 2026-08-20T10:39:15Z | |
| dc.date.copyright | 2025/09/24 | |
| dc.date.issued | 2025 | |
| dc.identifier.other | JCEMD4.COENG-16877.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311081 | |
| dc.description.abstract | AbstractTakt production is a location-based planning and controlling method that makes schedules
more reliable and shortens project durations with no increase in resources by promoting
the better use of the workspace. Although several recent publications ... | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Integrated Forecasting Approach for Takt and Location-Based Scheduling | |
| dc.type | Journal Article | |
| dc.journal.volume | 151 | |
| dc.journal.issue | 12 | |
| dc.journal.title | Journal of Construction Engineering and Management | |
| dc.identifier.doi | 10.1061/JCEMD4.COENG-16877 | |
| dc.journal.fristpage | 04025199-1 | |
| dc.journal.lastpage | 04025199-14 | |
| dc.page | 14 | |
| dc.tree | Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012 | |
| dc.contenttype | Fulltext | |