Show simple item record

dc.contributor.authorSeppänen, Olli
dc.date.accessioned2026-08-20T10:39:15Z
dc.date.available2026-08-20T10:39:15Z
dc.date.copyright2025/09/24
dc.date.issued2025
dc.identifier.otherJCEMD4.COENG-16877.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311081
dc.description.abstractAbstractTakt production is a location-based planning and controlling method that makes schedules more reliable and shortens project durations with no increase in resources by promoting the better use of the workspace. Although several recent publications ...
dc.publisherAmerican Society of Civil Engineers
dc.titleIntegrated Forecasting Approach for Takt and Location-Based Scheduling
dc.typeJournal Article
dc.journal.volume151
dc.journal.issue12
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/JCEMD4.COENG-16877
dc.journal.fristpage04025199-1
dc.journal.lastpage04025199-14
dc.page14
dc.treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record