    A Project Scheduling Optimization Model for Reducing Construction Dust Emissions Based on Variability in Meteorological Conditions

    Thumbnail
    View/Open
    JCEMD4.COENG-16730.pdf (3.493Mb)
    Date
    2025
    Author
    Li, Yifei
    Zhang, Lihui
    Liu, Xiaoli
    Li, Xingmei
    Metadata
    Show full item record
    Abstract
    AbstractDust emissions from construction activities are one of the main sources of atmospheric particulate pollution, which can pose serious health risks and environmental impacts. Meteorological conditions such as wind speed, humidity, and temperature ...
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4311050
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV