• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Exploring Practitioners’ Perceptions of Digital Delivery in Modular Integrated Construction Projects

    Thumbnail
    View/Open
    JMENEA.MEENG-6304.pdf (1.741Mb)
    Date
    2025
    Author
    Shuo Wang
    Yujie Lu
    Jiahui Lu
    Ye Mao
    Na Wang
    Zhenyu Guo
    Metadata
    Show full item record
    Abstract
    Modular integrated construction (MiC) leverages prefabricated modules to enhance constructability and sustainability, and serves as a critical solution to global housing demands. However, MiC confronts delivery challenges due to the complexity of integrated modular product delivery. Integrated digital delivery (IDD) employs digital technologies for a collaborative construction approach, improving efficiency, productivity, and communication in all stages, and is a crucial delivery method for MiC. This study explored practitioners’ perceptions of IDD in MiC projects in the era of digitization by establishing a hybrid investigation that incorporated empirical analysis, structural equation modeling, and interactive strategy. The proposed model expands the technology acceptance model (TAM) to include elements essential to IDD such as critical success factors, support mechanisms for adopting IDD, and feedback processes—alongside the original TAM. The partial least squares structural equation modeling (PLS-SEM) method was used to analyze data and evaluate each model constructs and path hypotheses. The key findings reveal that enhancing the ease of use of the common data environment significantly impacts MiC projects. Additionally, outcome-based key performance indicators (KPIs) and information standards positively influence perceived usefulness, and the scope of business substantially moderates the relationship between perceived usefulness and actual IDD usage. Integrating model findings with expert feedback, we developed comprehensive strategies addressing organizational, knowledge, project, management, government, and financial aspects to mitigate barriers to IDD adoption. Ultimately, this study contributes to the construction industry and academia by helping practitioners understand the current acceptance status of IDD in MiC projects and highlighting actionable strategies for its implementation, thereby facilitating more-focused and effective future research.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309862
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV