Show simple item record

dc.contributor.authorJun Zhou
dc.contributor.authorLongyu Chen
dc.contributor.authorGuangchuan Liang
dc.contributor.authorZonghang Zhou
dc.contributor.authorPenghua Du
dc.date.accessioned2026-02-16T21:43:34Z
dc.date.available2026-02-16T21:43:34Z
dc.date.copyright2025/06/01
dc.date.issued2025
dc.identifier.otherJLEED9.EYENG-5886.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4309634
dc.description.abstractThe scheduling of modular equipment (ME) in gathering systems is related to not only node pressure but also the production of shale gas. As shale gas continues to be extracted, its production decreases, leading to continuous changes in the load rates of ME and various operating conditions. Although considerable research exists on the scheduling of ME, multiple types of ME and incorporating the hydraulic characteristics of the pipeline network are less common. For shale gas gathering system (SGGS), this paper has established a multitype ME scheduling optimization model coupled hydraulic characteristics (MMESH-model). The objective function of the model is to minimize total equipment cost, and the model is subject to the following constraints: pressure, compressor, well and platform throttling, node pressure balance, flow balance, nonpressurized equipment handling capacity, multitype ME scheduling, and equipment utilization. A case study is discussed to prove the proposed model. The scheduling scheme of the ME is obtained, which is different from that of the actual site. In the early stages of production, platform pressures could reach 9.87 MPa, whereas the station requires an external transmission pressure of 5.91 MPa. A platform pressure of 6.046 MPa suffices in the first year, eliminating the need for a compressor. Moreover, the separator is relocated 11 times, the dehydrator is not relocated, and the compressor is relocated eight times. In addition, the cost analysis shows that the procurement and operating costs of ME are much higher than other costs. As a result, a new method for optimizing ME in SGGS with coupled hydraulic calculation is developed, and this method has some guiding implications for SGGS operation and production.
dc.publisherAmerican Society of Civil Engineers
dc.titleCost-Effective Scheduling of Modular Equipment in Shale Gas Gathering Systems with Hydraulic Considerations
dc.typeJournal Article
dc.journal.volume151
dc.journal.issue3
dc.journal.titleJournal of Energy Engineering
dc.identifier.doi10.1061/JLEED9.EYENG-5886
dc.journal.fristpage04025020-1
dc.journal.lastpage04025020-18
dc.page18
dc.treeJournal of Energy Engineering:;2025:;Volume ( 151 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record