• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analysis of Claims Related to the Employer’s Project Manager in Construction Projects

    Thumbnail
    View/Open
    JLADAH.LADR-1195.pdf (3.621Mb)
    Date
    2025
    Author
    Elahe Pouyanrad
    Majid Parchamijalal
    Metadata
    Show full item record
    Abstract
    In the construction industry, various factors can impact project costs and performance. To ensure projects are executed within the scheduled timeframe, budget, and desired quality, it is crucial to minimize the causes of discrepancies. Among the project elements, including the employer, contractor, project managers (employer and contractor), and consultants, each has responsibilities to prevent claims in projects. The employer’s project manager plays a significant role in the causes of claims, necessitating a focus on preventing claims associated with their performance. This research aims to investigate disputes in construction projects, starting with the identification and categorization of the causes of claims. The role and responsibility of the employer’s project manager in managing these causes are analyzed to facilitate accurate project management and prevent claims. Through a literature review, expert opinions, and previous studies, the causes of claims in construction projects prevalent in the Iranian construction industry are identified and categorized. Pearson’s correlation coefficient is employed to determine the degree of correlation among the identified causes using the Python programming language. The analytical hierarchy process (AHP) technique in expert choice software is utilized to rank the identified causes. The research findings present the final classification of the causes of claims, consisting of six main groups with subcategories, totaling 32 causes. The linear relationships between the identified causes and their correlation and impact on each other are determined. The ranking of the identified causes is conducted twice: first, based on their occurrence in construction projects, and second, considering their correlation with the performance of the employer’s project manager. By analyzing both rankings, a final rating is obtained, which reflects the relationship between the employer’s project manager’s performance and the occurrence of causes. The final list provides practical insights into the causes of claims and their practical implications.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309604
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV