    Multiobjective Trade-Off Optimization of Time, Cost, Quality, and Carbon Emission in the Building Construction Stage

    Thumbnail
    View/Open
    JCEMD4.COENG-15773.pdf (1.593Mb)
    Date
    2025
    Author
    Haixin Wang
    Xin Chen
    Jiaqi Wang
    Wenfeng Guan
    Shengsong Wei
    Metadata
    Show full item record
    Abstract
    For a long time, the production management of the construction industry has been mostly based on experience, and there are often problems such as construction delays, high costs, quality defects, and serious pollution. In order to solve these problems, this paper introduces the quantitative methods of time, cost, quality, and carbon emission in the construction stage, constructs an optimization model of duration, cost, quality, and carbon emissions, and uses the ant colony optimization algorithm to solve the problem. Finally, through model simulation, the Pareto optimal solution is obtained, which proves the effectiveness of the method proposed in this paper. The research results of this paper can provide a feasible solution for decision-makers at construction sites, guiding on-site construction to achieve better production efficiency. At the same time, it offers a reference for construction management under the premise of low carbon in the construction industry. In addition, the method for quantifying carbon emissions during the construction phase proposed in this study can also provide a theoretical reference for future research on carbon emissions in the construction sector. Currently, most research focuses on macro-level carbon emissions of buildings across their life cycle, with limited attention to emissions during construction. Therefore, this paper leverages multiobjective and combinatorial optimization theories, incorporates actual construction processes, quantifies subobjectives, formulates multiple execution modes for each construction process, and establishes a multimode optimization model for construction duration, cost, quality, and carbon emissions. The ant colony algorithm is then used to solve the problem. Through this method, a feasible construction plan can be provided to construction site managers, who can guide the construction according to the plan and improve the extensive management of construction sites to reduce resource waste. The optimization of the construction process that takes carbon emissions into account also provides practical guidance for the sustainable development of the construction industry and the achievement of China’s dual carbon goals.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309375
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV