• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Heuristic Methods for Dynamic Multiproject Scheduling Problems with Stochastic Transfer Times

    Thumbnail
    View/Open
    JCEMD4.COENG-15342.pdf (1.135Mb)
    Date
    2025
    Author
    Haohua Zhang
    Lubo Li
    Erik Demeulemeester
    Sijun Bai
    Jingwen Zhang
    Metadata
    Show full item record
    Abstract
    In practice, activities of the construction multiproject use limited resources in different locations, which requires resources to be transferred frequently between projects or activities. In this study, we simultaneously consider the stochastic resource transfer times and the dynamic arrival of new projects during the multiproject execution and propose the resource-constrained dynamic multiproject scheduling problem with stochastic transfer times (RCDMPSP-STT). Since priority rule (PR)-based heuristic methods can efficiently solve project scheduling problems through real-time decision making in uncertain environments, we evaluate the performance of 72 PR-based heuristic methods based on six objectives from the project, multiproject, and resource perspectives. Each PR-based heuristic method consists of an activity priority rule (APR) and a transfer priority rule (TPR) to determine the sequence of activities and resource transfer. Moreover, based on the resource transfer information, we design eight new APRs. In addition, a hybrid PR-based heuristic method is proposed to select different PR-based heuristic methods for multiproject scheduling based on the arrival time of the new projects. Extensive numerical experiments show that the newly designed resource transfer information-based APRs and composite APRs perform better on the robustness and makespan objectives, respectively, with an improvement of 30.63% and 22.24% compared with the classical APRs. Furthermore, under different objectives and perspectives, better-performing PR-based heuristic methods are recommended for the project and multiproject managers.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309352
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV