• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Ergonomic Risk Mitigation through Workforce Planning for Construction Projects

    Thumbnail
    View/Open
    JCEMD4.COENG-15072.pdf (1.150Mb)
    Date
    2025
    Author
    Yu Tao
    Hao Hu
    Feng Xu
    Zhipeng Zhang
    Metadata
    Show full item record
    Abstract
    Construction workers are facing significant ergonomic risks, which negatively affect their health, safety, and productivity, and therefore it is essential to develop effective and applicable risk control measures. In addition to instrument-based risk control methods, which have received the most attention, another easy-to-implement strategy is to consider ergonomic risks in workforce planning to balance physical stress and rest allowance. This study was aimed at mitigating ergonomic risks through workforce planning for construction projects. First, the ergonomic risk can be measured by considering task-specific and personalized features together with processing time. On this basis, a multiobjective mixed-integer programming model with ergonomic considerations was developed. Specifically, ergonomic constraints limit the cumulative ergonomic risk for each worker, and the objective is to minimize overall ergonomic risks across all workers. Small-scale basic examples were used to compare the different strategies for how to take ergonomic risks into account. Then a real-world case was conducted to demonstrate the effectiveness and practicability of the proposed method. Compared with the default plan proposed by the onsite superintendents, a 5% decrease in total ergonomic risks and a 41% decrease in max individual cumulative risk was achieved. The method is easy to adopt compared with instrument-based intervention systems, and is flexible to be adjusted according to real-life situations, contributing to sustainable workforce development in the construction sector.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4309335
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV