dc.contributor.authorda Silva, Márcio J.
dc.contributor.authorPereira, Carlos E.
dc.date.accessioned2025-08-20T09:19:23Z
dc.date.available2025-08-20T09:19:23Z
dc.date.copyright2/28/2025 12:00:00 AM
dc.date.issued2025
dc.identifier.issn2332-9017
dc.identifier.otherrisk_011_02_021104.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4308085
dc.description.abstractThe effective management of process deviations and abnormal events depends on operational actions in providing the appropriate responses to each situation. Applications with requirements focused on the provision of resources tend to be handled by a human–machine interface (HMI) along with supervisory control and data acquisition (SCADA). Process reliability is achieved if the operation ensures that actions will be performed according to the required response and priority levels. This paper presents a novel architecture entitled the heuristic-based recommendation system (HB-RS). The main goal is to provide resources capable of streamlining the process of actively handling abnormal situations. For recommendation purposes, the use of probabilistic networks is proposed, which are well suited to represent uncertainty elements present in engineering applications. To create the inference mechanism for these systems, a multi-entity Bayesian network (MEBN) is proposed, highlighting the importance of semantic characterization via knowledge-based, probabilistic graphical model formalism, which is closely linked to the modeling paradigm in which we can predict situations. The developed capabilities have been applied to a real case study in the operation of a metro train system, and the results obtained indicate the value of the proposed method.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleHeuristic-Based Recommendation System for Dealing With Abnormal Situations in Industrial Applications
dc.typeJournal Paper
dc.journal.volume11
dc.journal.issue2
dc.journal.titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
dc.identifier.doi10.1115/1.4067827
dc.journal.fristpage21104-1
dc.journal.lastpage21104-10
dc.page10
dc.treeASCE-ASME J Risk and Uncert in Engrg Sys Part B Mech Engrg:;2025:;volume( 011 ):;issue: 002
dc.contenttypeFulltext