    Simulation and Replication of High-Pressure Hydrocarbon Pipeline Commissioning under Large-Drop Undulating Environments

    Thumbnail
    View/Open
    JPSEA2.PSENG-1842.pdf (4.479Mb)
    Date
    2025
    Author
    Chun Kang
    Xingbin Cao
    Penggang Zhang
    Yufa Deng
    Jie Feng
    Lin Xiong
    Wu Liu
    Xin’an Yang
    Metadata
    Show full item record
    Abstract
    The BoZi (BZ) hydrocarbon pipeline is a large descending pipeline that transports a mixture of condensate and light hydrocarbons. It is prone to evaporation during transportation, posing safety risks during commissioning. In this study, a transient hydraulic model of pipeline commissioning was developed to formulate the commissioning plan and operational procedures for the BZ pipeline. Parameters such as oil, gas, and water distribution; pig velocity; pressure profile; and liquid retention were simulated, assuming no gasification at high points and no overpressure at low points. During actual commissioning, due to fluctuations in hydrocarbon production at the first station, frequent adjustments to the main valve opening percentage, occurring 74 times, delays in switching between water and oil injection, and constraints on emission pipelines at the last station, the boundary conditions of the production calculation model were adjusted to reflect real production conditions. The water injection and oil injection processes during actual commissioning were completed, and the travel times of air–water and water–oil pigs were calculated. The deviation between calculated and monitored pressure along the pipeline was less than 1.5%, with no gas blockages or flow disruptions during commissioning. The predicted commissioning time was 95.4 h, which was 0.1 h less than the actual time. Through experimental validation, this study provides a practical solution for improving the efficiency and safety of pipeline commissioning. It helps engineers to study operational problems in advance of the commissioning with OLGA simulation software, increase the success rate, and minimize the environmental impact, thus advancing the development of pipeline commissioning technology.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4307906
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV