• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Enhancing Safety and Performance in Temporary Brackets: Insights into Forensic Analysis and Construction Errors

    Thumbnail
    View/Open
    JPCFEV.CFENG-4800.pdf (6.233Mb)
    Date
    2025
    Author
    Liumeng Quan
    Mingjian Zhang
    Weidong Shao
    Weibing Peng
    Metadata
    Show full item record
    Abstract
    On August 17, 2021, a steel bracket of an under-construction bridge in Anhui, China, experienced a catastrophic failure. This incident raised significant concerns about the design and construction of temporary structures. In response to the discovery of multiple construction errors in the debris, a novel, comprehensive investigation was undertaken. The present study involved an on-site survey, joint capacity analysis, and advanced finite-element modeling to elucidate the specific sequence of failures. The primary cause of the initial failure was identified as the absence of welding and two missing bolts in a particular connection area. The results of the redundancy assessment by nonlinear analysis suggest that the shear resistance contribution of the additional welding reinforcement in the bolt connection accounts for more than 50%, and safety was still ensured even without connecting bolts. The results also indicate that the six-bolt design could lead to bolt slippage before the upper chord reaches its yield point. Further, even the eight-bolt design, which was recommended based on joint capacity analysis and elastic analysis, may not be sufficient to prevent premature brittle failure in the bolts. However, since collapse resistance is governed by ultimate strengths, the revised bracket design, incorporating the necessary mechanisms, requires a minimum of 11 bolts. This adjustment accounts for the impact of various processing techniques on the steel’s performance. The new design exhibited a 175% increase in load-carrying capacity before bolt slippage occurred, even in the presence of the same construction errors. The innovative matching mechanism effectively mitigated premature failure, primarily by preventing bolt slippage prior to the yielding of ductile members.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4307816
    Collections
    • Journal of Performance of Constructed Facilities

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV