• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Enhancing Claims Management in the Construction Industry Using Analytic Hierarchy Process

    Thumbnail
    View/Open
    JLADAH.LADR-1268.pdf (484.4Kb)
    Date
    2025
    Author
    Khaled Alrasheed
    Maryam Bahman
    Ehab Soliman
    Haya Albader
    Metadata
    Show full item record
    Abstract
    The complexity of the construction industry makes it vulnerable to disputes and claims, emphasizing the necessity for an effective claims management system. Despite its critical importance, limited research on identifying and prioritizing key factors for efficient claims management exists. This study addresses this gap by using data from Kuwait’s construction sector, which is characterized by distinctive challenges, including reliance on heavily amended International Federation of Consulting Engineers (FIDIC) contracts, fragmented regulatory oversight, delayed payments, and lowest-bid procurement practices. The methodology began with a comprehensive literature review to identify factors influencing claims management efficiency, followed by a pilot survey with seven industry experts to refine factors. Forty-six factors were identified and structured into a four-level hierarchy: goal, criteria, subcriteria, and factors. Using the analytic hierarchy process (AHP), these factors were prioritized through a questionnaire distributed to 51 respondents. Results indicated that strategic criteria, particularly those related to the pre-tender phase, are more effective than operational criteria during construction. The AHP consistency index confirmed the robustness of these assessments. Findings suggest that enhancing contract documentation and establishing clear claims mitigation procedures, agreed upon by all project parties from the outset, can significantly improve claims management. The results provide valuable insights for enhancing claims management in Kuwait’s construction environment or similar contexts.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4307541
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV