• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Schedule Information Modeling for Forensic Analysis and Assessment of Time Claims

    Thumbnail
    View/Open
    JLADAH.LADR-1239.pdf (1.197Mb)
    Date
    2025
    Author
    Muaz Fagiar
    Yasser Mohamed
    Simaan AbouRizk
    Metadata
    Show full item record
    Abstract
    The contemporary landscape of construction projects witnesses a notable inclination toward heightened complexity and specialization, contributing to an increase in both the frequency and intricacy of construction claims. Among these, disputes concerning schedule impacts emerge as the most prevalent, yet also the most intricate and least comprehended. Existing methodologies for analysis persist as costly, time-consuming, and complex, often failing to accurately address impacts of delays lasting less than a day. In response to these shortcomings, this study introduces a novel framework termed Forensic Schedule Information Modeling (ForSIM) designed specifically for the analysis of time-related claims within construction projects. ForSIM adopts key principles derived from window-based analytical techniques, thereby incorporating established methodologies within its structure. Additionally, ForSIM adopts a time-step simulation approach, which serves as a foundational mechanism for both the modeling and integration of project data. Through this approach, ForSIM streamlines the process of automated data integration, analysis, and the quantification of both acceleration and time extension awards. Moreover, it provides detailed demonstrations of causation, thereby enhancing clarity in dispute resolution processes. A prototype of ForSIM has undergone rigorous development and testing procedures, elucidating its effectiveness in addressing the constraints associated with prevailing methodologies. The findings of this study highlight the transformative potential of ForSIM in augmenting industry practices, facilitating more efficient and accurate evaluations of time claims within construction projects.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4307535
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV