Show simple item record

dc.contributor.authorSonglin He
dc.contributor.authorRenshu Yang
dc.contributor.authorChenxi Ding
dc.contributor.authorZhenxiang Yan
dc.contributor.authorShuai You
dc.contributor.authorYu Wang
dc.contributor.authorSen Liu
dc.contributor.authorXuewen Wang
dc.date.accessioned2025-08-17T22:49:54Z
dc.date.available2025-08-17T22:49:54Z
dc.date.copyright5/1/2025 12:00:00 AM
dc.date.issued2025
dc.identifier.otherIJGNAI.GMENG-10433.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4307514
dc.description.abstractIn response to the challenges encountered during deep-hole straight-eye barrel-shaped slot blasting for tunnel excavation, where it is difficult to discharge fragmented rock and achieve high single-cycle footage, an enhanced throwing technique at the bottom of the hole is proposed. This technique builds upon traditional segmented charging technology and is applied at the Xingshan underground iron mine of Shougang. This method, modeled using the smoothed particle hydrodynamics–finite-element method (SPH-FEM), assesses improvements in rock particle dynamics, ejection speeds, and slot volumes compared to conventional approaches. The analysis reveals that traditional segmented charging structures in the slot lead to collisions and compressions of fragmented rocks during the detonation of the upper section, hindering the ejection process and impacting the blasting results of the lower section. The enhanced scheme significantly boosts the ejection speeds of the lower section’s fragmented rocks, with peak velocities increasing by 76.9%–86.6%, and final ejection speeds rising by two to eight times. It also effectively mitigates issues of midsection clogging, resulting in an 11% increase in slot volume. Field tests demonstrate that this innovative method achieves an average slotting advancement of 3.43 m and a borehole utilization rate of 92.7%, marking an 11.6% improvement over traditional methods. These findings provide crucial guidance for optimizing similar mining operations.
dc.publisherAmerican Society of Civil Engineers
dc.titleRock Fracture Mechanism and Engineering Application of a Special Cut-Blasting Method with Loading Explosives at the Bottom of an Empty Hole
dc.typeJournal Article
dc.journal.volume25
dc.journal.issue5
dc.journal.titleInternational Journal of Geomechanics
dc.identifier.doi10.1061/IJGNAI.GMENG-10433
dc.journal.fristpage04025049-1
dc.journal.lastpage04025049-13
dc.page13
dc.treeInternational Journal of Geomechanics:;2025:;Volume ( 025 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record