• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Condenser Retrofit in Leibstadt Nuclear Power Plant (Boiling Water Reactor): Far Beyond a Standard Modular Solution

    Thumbnail
    View/Open
    gtp_146_07_071011.pdf (5.797Mb)
    Date
    2024
    Author
    Wolf, Hartwig
    Wettstein, Arthur
    Faltermeier, Robert
    Graf, Peter
    Schupp, Daniel
    Metadata
    Show full item record
    Abstract
    The Leibstadt nuclear power plant (KKL) in Switzerland was originally commissioned in 1984 with a nominal power output of 1000 MWel. Since then, there have been several uprates of the boiling water reactor (BWR), which have increased the power to 1275 MWel. After the nearly four decades of operation, the original condenser was impacted by advanced erosion corrosion and by progressive performance deterioration. In addition, the thermal power uprates required load reduction during hot summer periods to avoid high condenser back pressure. Consequently, KKL asked GE to carry out a comprehensive retrofit study to identify potential improvements on both lifetime and performance. These included robust material selection, optimized extraction of noncondensable gases by means of a bespoke air cooler section of the condenser and applying GE Steam Power's latest innovative tube pattern design, which is aligned to BWR requirements. However, site constraints prevented a typical modular condenser retrofit. Hence, working in a close cooperation between KKL and GE Steam Power, a customized retrofit concept was developed which used semi-prefabricated skeletal modules and an on-site rebuild of the condenser. In total, approximately 475 tons of old condenser material were dismantled, 24 new semi-prefabricated skeletal modules were installed, a condenser with 51,600 tubes was rebuilt on-site and 8 waterboxes were replaced with an improved design made of stainless steel. More than 350 professionals contributed to the successful retrofit with an overall site effort of 270,000 working hours—increasing the power output to 1285 MWel.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4302909
    Collections
    • Journal of Engineering for Gas Turbines and Power

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV