dc.description.abstractDeployment of the solar field of a concentrating solar power plant is one of many factors that are integral to the success of a project. Knowledge transfer from outside the industry is limited due to the unique nature of heliostats, which redirect sunlight to a receiver with high precision while maintaining a high level of reflectivity. Moreover, learning from project to project can be limited due to the site-specific nature of projects, as the market includes several developers, each with their own unique design. In this paper, we discuss the state of the art in heliostat field deployment. We cover all the key aspects of deployment from project assessment to a fully functioning system, which include site selection, layout development, supply chain, assembly, site preparation and construction, calibration, and operations and maintenance. We then perform a gap analysis on field deployment and recommend priorities for future research.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleStatus Quo and Gap Analysis of Heliostat Field Deployment Processes for Concentrating Solar Tower Plants
dc.typeJournal Paper
dc.journal.volume146
dc.journal.issue6
dc.journal.titleJournal of Solar Energy Engineering
dc.identifier.doi10.1115/1.4065430
dc.journal.fristpage61004-1
dc.journal.lastpage61004-10
dc.page10
dc.treeJournal of Solar Energy Engineering:;2024:;volume( 146 ):;issue: 006