• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A Critical Assessment of Material Price Adjustment Clauses for Transportation Design–Build Projects

    Thumbnail
    View/Open
    JLADAH.LADR-1126.pdf (1.569Mb)
    Date
    2024
    Author
    Moe Kyaw Thu
    Parker Hamilton
    Jung Hyun Lee
    Gordan Kingsley
    Baabak Ashuri
    Metadata
    Show full item record
    Abstract
    The transportation construction industry is experiencing a substantial risk of material price volatility impacting owners and contractors in successful delivery of projects on budget and on time. The risk is significant for design-build (DB) transportation projects as the entire risks for design and construction services are transferred to design-build teams. Unlike traditional design-bid-build (DBB) projects, the detailed quantities are not specified in DB transportation contracts that are typically fixed-priced contracts. Also, DB transportation projects are often large and multi-year, exacerbating the risk of material price uncertainty over the long project duration. Price adjustment clauses (PACs) have been introduced as a risk allocation mechanism to stabilize the bidding environment for transportation projects. While PACs have been employed in DBB projects for some time, the use of PACs for DB transportation projects is still at an early stage. Therefore, there is a need to better understand how various transportation agencies have incorporated the PAC into their DB transportation projects. The major objective of this research is to examine the current utilization of the PAC among state DOTs in their DB transportation projects. This study employs a combination of survey questionnaires and semistructured interviews involving subject matter experts from state departments of transportation (state DOTs) engaged in alternative project delivery to highlight the widespread adoption of PACs for four primary material line items: fuel, steel, asphalt, and portland cement. The main findings of this study show that while the PACs are adopted at varying levels across different states, they are not seen as critical deal-breakers, as their absence does not significantly deter industry participation in transportation DB projects. Rather, they are generally viewed as more beneficial in multiyear and large DB transportation projects, where price fluctuations and cost escalation are more likely. This study contributes to the body of knowledge on transportation DB projects by providing valuable insights into the thresholds and mechanisms used for price adjustments within PACs, showcasing how they enhance risk allocation. Additionally, this study recognizes the implications of recent events, such as increases in inflation and interest rates, on the consideration of PAC implementation and expansion. Finally, from a practical standpoint, these findings offer state DOTs invaluable guidance to enhance procurement strategies and contract provisions, and increase competition in the infrastructure market, ensuring successful project execution and financial feasibility in transportation DB projects.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4299124
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV