• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Stakeholder-Induced Disputes and Resolution Strategies in the Infrastructure Industry

    Thumbnail
    View/Open
    JLADAH.LADR-1087.pdf (947.6Kb)
    Date
    2024
    Author
    Vinay Ganpat Surve
    Venkata Santosh Kumar Delhi
    Metadata
    Show full item record
    Abstract
    Stakeholders are classified either as internal or external in extant literature. However, it is observed that critical activities such as work front availability, clearances, and utility shifting are influenced by a third category of stakeholders who display unique characteristics that differentiate their behavior from the previous two types. Hence, this study introduces a third category-extraneous stakeholders—with characteristics distinct in their relationship to the project and behavior. The study maps the performance of such stakeholders to the resulting consequences leading to disputes in Indian Infrastructure projects. To do so, the study utilized data from 100 court cases in India that revealed dispute genres related to extraneous stakeholders. Further, semistructured interviews were conducted with 14 experts to comprehend the influence of such stakeholders’ performance on dispute-related risks. Finally, case studies of five infrastructure projects were undertaken to confirm and validate the findings. The analysis demonstrated that extraneous stakeholders usually fail to deliver time-bound results, thus increasing project uncertainties. Such uncertainties predominantly supervene the disputes between the employer and the contractor that remain challenging to settle. The incentive structures and the contractual obligations designed for extraneous stakeholders become essential. To this end, four mitigation strategies are highlighted, and the strategies’ effectiveness from the perspective of extant strategic management theories is discussed.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4299118
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV