• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Hazardous, Toxic, and Radioactive Waste
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Hazardous, Toxic, and Radioactive Waste
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Gowanus Canal Superfund Site. VII: Rapid Verification of Organoclay–Sand Capping Blends

    Thumbnail
    View/Open
    JHTRBP.HZENG-1375.pdf (1.231Mb)
    Date
    2024
    Author
    Alyssa B. Lampi
    Dennis G. Grubb
    Nasser Hamdan
    Dusty R. V. Berggren
    Metadata
    Show full item record
    Abstract
    At the Gowanus Canal Superfund site in Brooklyn, New York, a multilayer reactive capping system is required as part of the approved remedy. The base reactive layer is an organoclay (OC)–sand layer containing a minimum of 25% by dry weight OC that is intended to block any upwelling mobile nonaqueous phase liquids (NAPLs). The construction quality assurance (CQA) method for verifying the OC content of the OC–sand stockpiles prior to placement in the canal consists of Loss on Ignition (LOI) testing performed at an offsite laboratory with a turnaround time of 3 days. To mitigate construction delays, rapid field testing methods to verify the OC content of the OC–sand blends were sought. Interestingly, electrical conductivity (EC) measurements on the as-is (not sieved or pulverized) OC, sand, and their blends provided several correlations with goodness of fit (R2) values >0.95 for a variety of sand-sized materials including: a commercial playground sand, beach sand, a limestone quarry sourced sand, and the sediment capping sand from the first Remedial Target Area (RTA-1) at the Gowanus Canal. The correlation curves and R2 values were relatively insensitive to change in the sand borrow source (silicate or karst geology or salinity). EC measurements were available in as little as 30 min and up to approximately 24 h using a tabletop pH/EC probe, distilled water, beaker, and magnetic stirrer. The EC approach and preliminary correlations presented here can greatly reduce CQA testing turnaround times to within hours (not days) in field settings. Lastly, similar findings were made when another commercially modified bentonite clay known as Fluorosorb-400™ was blended with playground sand.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4299038
    Collections
    • Journal of Hazardous, Toxic, and Radioactive Waste

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV