• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Premapping of Dynamic Indoor Construction Sites Using Prior Construction Progress Video to Enhance UGV Path Planning

    Thumbnail
    View/Open
    JCCEE5.CPENG-5819.pdf (1.873Mb)
    Date
    2024
    Author
    Houhao Liang
    Justin K. W. Yeoh
    David K. H. Chua
    Metadata
    Show full item record
    Abstract
    Accurate mapping is crucial for the successful deployment of unmanned ground vehicles (UGVs) in navigation tasks. However, maps derived from as-designed models often lack realism and fail to reflect dynamic changes on construction sites. To address this issue, a premapping method leveraging prior construction progress video is proposed to create up-to-date navigation maps. This method proactively accounts for dynamic changes, particularly those caused by transient objects that are present only during the progress video collection phase and may not exist at the time of UGV deployment. The proposed approach involves detecting, tracking, and segmenting these transient objects, followed by their removal using a flow-guided model. The cleaned frames are used to reconstruct an updated point cloud, which serves as the basis for defining a two-dimensional (2D) navigation map. By considering these changes during the premapping process, the method ensures that the resulting map is consistent with the actual site conditions. Validation in an indoor construction setting demonstrated the necessity of the proposed method and highlighted the impacts of transient objects on path planning outcomes. This method is beneficial for routine monitoring scenarios, for which it can update and transform prior video into a navigation map, enabling efficient advanced planning. The practical application of this study primarily lies in enhancing the deployment efficiency of unmanned ground vehicles for routine monitoring of construction sites. The proposed premapping method, which leverages prior construction progress video, offers two key practical benefits. Firstly, as an offsite premapping approach, it enables the creation of maps without interfering with ongoing construction activities, minimizing on-site operations. This enhances UGV acceptance on site and maintains regular site workflows. Secondly, by proactively considering the dynamic changes caused by transient objects, the method ensures that the created map is up-to-date and provides a more comprehensive basis for efficient initial planning. This premapping approach is particularly beneficial for routine monitoring scenarios, because it reduces operational efforts by providing effective and up-to-date maps derived from construction progress video. By doing so, it enhances both the efficiency of UGV deployment and the effectiveness of advanced planning in dynamic construction environments.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4298663
    Collections
    • Journal of Computing in Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV