Show simple item record

dc.contributor.authorAhmad Salah Edeen Nassef
dc.date.accessioned2024-12-24T10:11:21Z
dc.date.available2024-12-24T10:11:21Z
dc.date.copyright8/1/2024 12:00:00 AM
dc.date.issued2024
dc.identifier.otherPPSCFX.SCENG-1462.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4298457
dc.description.abstractThis paper aims to investigate the effects of using palm leaves ash, when it partially replaces the concrete cement content, to treat the effects of using seawater as a mixing water and curing water on concrete. The paper also explores the suitable replacement percentage of cement with palm ash to give the concrete more strength and suitable workability. A slump test was used to assess the fresh concrete’s workability, as well as concrete strength testing after 7, 28, and 60 days. It was found that 5% of the cement replacement with palm leaves ash in conjunction with the full replacement of the mixing of pure water with seawater achieves an 84.188% increase in the ultimate compressive strength after 28 days of curing in tap water compared with that gained by normal concrete with mixing in seawater. Also, a reasonable workability was obtained. In the case of curing with seawater for 28 days, the partial replacement of 2.5% of cement with palm leaves ash achieves a 70.75% increase in the compressive strength when compared to normal concrete with mixing in seawater.
dc.publisherAmerican Society of Civil Engineers
dc.titleTreatment of Saline Concrete with Palm Ash
dc.typeJournal Article
dc.journal.volume29
dc.journal.issue3
dc.journal.titlePractice Periodical on Structural Design and Construction
dc.identifier.doi10.1061/PPSCFX.SCENG-1462
dc.journal.fristpage04024034-1
dc.journal.lastpage04024034-5
dc.page5
dc.treePractice Periodical on Structural Design and Construction:;2024:;Volume ( 029 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record