• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimal Rehabilitation Procedure for Intermittent Water Supply Systems

    Thumbnail
    View/Open
    JWRMD5.WRENG-6129.pdf (3.412Mb)
    Date
    2024
    Author
    Bruno Brentan
    Ariele Zanfei
    Rui Gabriel Souza
    Andrea Menapace
    Gustavo Meirelles
    Joaquín Izquierdo
    Metadata
    Show full item record
    Abstract
    Water demand continuously increases in urban zones, and water scarcity is frequently associated with a lack or a reduction of water availability at water sources and maintenance problems, such as leakage and pipe aging. These facts inevitably lead to challenging water distribution system (WDS) management. In this scenario, intermittent operation emerges as an alternative to system operation. This is not the most desirable solution from a social perspective because many consumers cannot be supplied as desired for days. To tackle problems like this, many works have investigated how to help decision makers improve water system efficiency during the last decades. Nevertheless, few works have considered combining several structural interventions, such as pipe replacement, installation of new pump stations, fixing leaks, and installing and controlling pump stations and valves. One reason is that alternatives for recovering the hydraulic capacity in decision-making processes are computationally burdensome, mathematically complex, and, sometimes, even physically incompatible. Considering the problem stated by the Battle of Intermittent Water Supply, this work proposes a methodology for optimal operation and recovery of a WDS. The Battle problem is presented in two stages organized during different years: Year 0 and the following 5 years. For Year 0, only operational optimization is allowed. Consequently, optimal operation of pumps and valves is proposed for this initial year to maximize the number of nodes being supplied. For the rest of the years, because implementing structural changes is allowed within a defined budget, the proposal suggests applying a search space reduction process based on a cost-benefit trade-off and the hydraulic relevance of each structural alternative evaluated individually in terms of the nine indicators proposed in the Battle statement. Those alternatives that better improve the indicators are then considered in a multiobjective optimization setting. For every year, a set of structural changes is selected, followed by related changes in the operational setup. The alternatives are selected year by year and evaluated considering the past selected alternatives to assess the effects during the five evaluation years. This is done in a dynamic programming process, ensuring that a near optimal is achieved by the end of the last, fifth, year.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4298382
    Collections
    • Journal of Water Resources Planning and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV