    Evolvement of Excusable Delay Clauses in Government Contracts since the COVID-19 Pandemic

    Thumbnail
    View/Open
    10.1061-JLADAH.LADR-1059.pdf (2.065Mb)
    Date
    2024/02/01
    Author
    Jung Hyun Lee
    Yunping Liang
    Seyed Mohammad Ehsan Tabatabaee
    Bryce Riccitelli
    Metadata
    Show full item record
    Abstract
    Excusable delay clauses in government construction contracts, often considered boilerplate with minimal modifications, have increased in attention since the outbreak of COVID-19. Despite the studies enumerating triggering events of the clause in the background of the pandemic, it is necessary to capture insights into how the unprecedented event is systematically accommodated by contract languages. The overarching goal of this study is to identify changes in contract languages over the pre-and post-pandemic eras by state departments of transportation (DOTs), focusing on excusable delay clauses. This study conducts a content analysis and a comparative analysis of state DOT construction contract documents, including requests for proposals and agreements. Longitudinally, the study analyzes changes within a state DOT over the pre-and postpandemic eras. Cross-sectionally, the study compares the similarities and differences in the changes across different state DOTs. The results show that many DOTs specify a list of events that trigger the excusable delay clauses in the postpandemic era. The study also identifies example languages, such as quarantine restrictions and material escalations, that have been added in the postpandemic era. This study contributes to understanding how excusable delay contract languages have changed pre- and post-COVID-19 and the events that trigger such clauses in government construction projects. The findings are anticipated to benefit practitioners, especially those in the US transportation infrastructure industry and other common law authorities, by benchmarking necessary contract clause changes about the pandemic and unprecedented future events alike.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297745
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV