• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Delay Dispute Cases: Comparative Analysis and Claimed Value Prediction Model

    Thumbnail
    View/Open
    10.1061-JLADAH.LADR-1038.pdf (475.3Kb)
    Date
    2024/02/01
    Author
    Khaled A. Alrasheed
    Ehab M. Soliman
    Haya B. Al-Bader
    Metadata
    Show full item record
    Abstract
    Construction project delays are a common issue faced by the industry worldwide, leading to disputes among project stakeholders and generating additional costs. This study analyzes construction project delay disputes, using randomly selected litigated cases of delayed construction projects from Kuwait. Data from 40 real delay dispute cases obtained from the Department of Experts at the Ministry of Justice in Kuwait were analyzed, and a multilinear regression model was developed to predict the claimed value resulting from delay disputes, which could be a crucial aspect in determining legal system fees and project cost estimations. The study compared real case dispute analysis with those previously published. The results of the study revealed that the most common source of delay disputes is those between the client and contractor, forming about 75% of the total delay disputes cases and 97% of claimed values. Additionally, the findings showed that there are significant differences between the real-world causes of delay disputes and previous research results on the topic. The findings highlight the importance of understanding the causes of construction project delays and improving project cost estimation during the tendering process. This research has practical implications for stakeholders in the construction industry who are aiming to minimize the negative impacts of project delays and disputes, and effectively manage delay conflicts in the future.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297736
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV