• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Impacts of Increased Prediction Accuracy in Management Decisions: A Study of Full-Depth Reclamation Pavements

    Thumbnail
    View/Open
    10.1061-JITSE4.ISENG-2400.pdf (1.184Mb)
    Date
    2024/03/01
    Author
    Elijah Evers
    Cristina Torres-Machi
    Metadata
    Show full item record
    Abstract
    Given the abundance of condition data regularly collected for major roadways, machine learning has the potential to enhance pavement deterioration modeling. This is particularly important for recycling-based rehabilitation techniques, such as full-depth reclamation (FDR), which lack accurate models of deterioration. Previous studies have demonstrated the effectiveness of machine learning (ML) to predict pavement deterioration. However, the increased accuracy of these models often is reported using statistical metrics that pavement managers cannot easily relate to asset management decision-making. This paper quantifies the impacts that increased accuracies in deterioration modeling have on relevant metrics used in the management of pavement assets. The study analyzed the performance of full-depth-reclamation pavements and developed random forest models to estimate roughness, rutting, and fatigue cracking. These random forest models were compared with mechanistic-empirical (M-E) models tuned to the same sites to quantify differences in prediction accuracy, useful life, life-cycle costs, and long-term performance. The tuned random forest deterioration models reduced errors by 90%–97% compared with the tuned M-E models. The results suggest that M-E predicts that FDR reaches the end of service life 8 years sooner than do the random forest predictions. The long-term performance of FDR was found to be 28%–73% higher in a 10-year design life than M-E models predict. This indicates that FDR is significantly more cost-effective than is presumed by M-E predictions, and that improvements in the accuracy of FDR predictions may result in more-informed decision-making.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297724
    Collections
    • Journal of Infrastructure Systems

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV