• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Fatigue Performance of a Novel Steel–Concrete Joint of a Long-Span High-Speed Railway Hybrid Girder–Cable-Stayed Bridge

    Thumbnail
    View/Open
    10.1061-JBENF2.BEENG-6425.pdf (4.073Mb)
    Date
    2024/01/01
    Author
    Zhou Shi
    Yingming Li
    Yi Yang
    Xupo Zhao
    Wanqing Yu
    Metadata
    Show full item record
    Abstract
    The steel–concrete joint (SCJ) of a railway hybrid girder–cable-stayed bridge transmits tremendous internal forces, resulting in complex structure and stress. The existing complex SCJs lead to difficulties in on-site concrete construction, and the complex stress of the SCJ under train load is prone to diseases such as steel concrete fatigue detachment and cracking. To investigate the complex fatigue performance of a novel SCJ for a long-span high-speed railway hybrid box girder–cable-stayed bridge with a main span of 672 m, finite-element analysis (FEA) and a 1:2 scaled fatigue model test with 2.15 million cycles were conducted. The results showed that the numerical fatigue stresses of the SCJ exhibited a significant shear lag effect in the transverse direction with unfavorable fatigue stresses at the side box. After 1.70 million loading cycles, all the steel plates of the test model remained intact, indicating good fatigue resistance during the design life. Cracks appeared at the junction between the horizontal diaphragm and the web of the steel transition segment (STS) after 1.85 million cycles, showing a fatigue life of 118 years. The measured fatigue crack life of the concrete deck over the postanchor position of the prestressed tendons in the STS was 30.5 years for the local concentrated tensile stress, which can be improved by casting the concrete after the tendons are prestressed. No fracture or other abnormalities occurred in the shear studs and perforated rib (PBL) rebars, and the deflection of the test model and the slip between the steel and concrete were insignificant during the fatigue tests, indicating the good fatigue performance of the SCJ, which was better than that of the STS. The thickness of the bearing plate and diameter of the shear studs for the actual SCJ were suggested to be 40–60 and 16–25 mm, respectively, based on a parametric study.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297284
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV