• Login
    View Item 
    •   DSpace Home
    • ASCE
    • International Journal of Geomechanics
    • View Item
    •   DSpace Home
    • ASCE
    • International Journal of Geomechanics
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Numerical Study on the Rock-Breaking Mechanism and Stress Superposition Effect of Double-Hole Delayed Blasting in Deep Reservoirs

    Thumbnail
    View/Open
    10.1061-IJGNAI.GMENG-8858.pdf (2.187Mb)
    Date
    2024/03/01
    Author
    Wang Wen
    Wei Wang
    Yuan Wei
    Genmao Zhou
    Xuebin Su
    Xiaoqiao Feng
    Xuanyu Liang
    Metadata
    Show full item record
    Abstract
    With the application of electronic detonators, delayed blasting is considered a very effective method to improve rock fragmentation, and this technique is widely used in practical engineering. Therefore, it is necessary to study the rock-breaking mechanism of double-hole delayed blasting. In this paper, based on the finite difference method, the influence of double-hole delayed blasting on the reservoir permeability was quantitatively analyzed by adopting the adjacent hole spacing, delay time, and decoupling coefficient (K) as variables and the permeability increment as an evaluation index. Based on the parameters studied in this paper, it was found that the effect of the delay time on the reservoir permeability depends on the hole spacing. When the hole spacing is less than 20ra (ra is the borehole radius), a reasonable delay time could significantly increase the reservoir permeability, but when the hole spacing is greater than 20ra, the delay time does not affect reservoir permeability enhancement. The decoupling coefficient could control the attenuation speed of shock wave energy. For K = 2, energy attenuation occurred the slowest, and the reservoir permeability increase effect was the best. Based on site-scale numerical simulations, the mechanism of stress superposition between boreholes was revealed, and the position of stress superposition was controlled by adjusting the delay time to break hard reservoir rock so that the cracks between two holes were connected, i.e., accurate reservoir reconstruction was achieved. This work provides a certain guiding basis for actual engineering applications.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4296680
    Collections
    • International Journal of Geomechanics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV