Show simple item record

dc.contributor.authorPeixin Xu
dc.contributor.authorDerun Zhang
dc.contributor.authorHuijie Lv
dc.date.accessioned2024-04-27T22:26:30Z
dc.date.available2024-04-27T22:26:30Z
dc.date.issued2024/03/01
dc.identifier.other10.1061-JPEODX.PVENG-1261.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4296660
dc.description.abstractThe traditional mechanical equipment/chemical salt approach for pavement snow/ice removal is costly and may cause serious environmental pollution problems. To facilitate the pavement snow/ice melting in a more economical and sustainable way, a novel steel slag–based composite phase change aggregate (SS-CPCA) asphalt pavement was developed, and its technical performance was experimentally evaluated. The experimental results revealed that: (1) after 14 cycles of freeze–thaw treatment, the SS-CPCA asphalt pavement has an identical temperature regulation performance as its initial state, identifying that its long-term thermal durability is promising; (2) snow layer with a thickness of 5 mm that is covered on the SS-CPCA asphalt pavement at 0°C can be melted completely within 32 min, verifying that the SS-CPCA asphalt pavement has a satisfactory snow melting performance; and (3) a decrease of environmental temperature can result in an increase of ice melting rate (IMR) and a decrease of effective ice melting time (EIMT), indicating that the IMR and EIMT should be balanced to each other when selecting appropriate PCMs for pavement snow/ice melting. In addition, the economic–environmental performance of the SS-CPCA asphalt pavement was examined through a case study. It was found that, as compared with conventional asphalt pavements, it has a relatively higher initial construction cost. However, when taking the snow/ice removal cost into account, its total cost is significantly lower for the second-year application. Further, the SS-CPCA asphalt pavement can dramatically reduce CO2 emissions as compared with the traditional snow/ice melting approaches. Thus, it can be concluded that the newly developed SS-CPCA asphalt pavement can provide considerable economic–environmental benefits toward the pavement’s snow/ice melting.
dc.publisherASCE
dc.titleSnow and Ice Melting Performance Evaluation and Economic–Environmental Assessment of a Novel Steel Slag–Based Composite Phase Change Aggregate Asphalt Pavement
dc.typeJournal Article
dc.journal.volume150
dc.journal.issue1
dc.journal.titleJournal of Transportation Engineering, Part B: Pavements
dc.identifier.doi10.1061/JPEODX.PVENG-1261
dc.journal.fristpage04023033-1
dc.journal.lastpage04023033-14
dc.page14
dc.treeJournal of Transportation Engineering, Part B: Pavements:;2024:;Volume ( 150 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record