• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study

    Thumbnail
    View/Open
    10.1061-JMENEA.MEENG-5816.pdf (790.0Kb)
    Date
    2024/05/01
    Author
    Eunbeen Jeong
    Junyoung Jang
    Seulbi Lee
    Seungjun Ahn
    Tae Wan Kim
    Metadata
    Show full item record
    Abstract
    Installation time for precast concrete (PC) components varies due to component-, location-, and weather-related factors. Because such variability affects the cost, time, and sustainability performance of PC projects, it is important to identify and classify the factors influencing installation time for different types of PC components. Against this background, this study aims to empirically investigate variability in installation time for PC components and different work steps and then identify the factors that affect particular work steps most significantly. To achieve the goal, this study gathered installation time and other influencing factors data from an actual project for 25 days and analyzed the data using a descriptive approach and the recursive feature elimination with cross-validation (RFECV) analysis. The analysis result provides empirical evidence that different PC types and work steps are involved with different levels of variability in installation time. The highest level of variability was shown in PC beams and assembly work. Regarding the factors influencing installation time, it is shown that different work steps are affected by different sets of influencing factors, with temperature and wind speed as the most common influencing factors across different PC types and work steps. This study contributes to the body of knowledge of off-site construction management by offering empirical evidence on the variability in PC installation time and the specific factors affecting PC installation time.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4296584
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV