• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Methodology to Monitor Early Warnings Before Gas Turbine Trip

    Thumbnail
    View/Open
    gtp_146_05_051005.pdf (1.898Mb)
    Date
    2023
    Author
    Losi, Enzo
    Venturini, Mauro
    Manservigi, Lucrezia
    Bechini, Giovanni
    Metadata
    Show full item record
    Abstract
    The current energy scenario requires that gas turbines (GTs) operate at their maximum efficiency and highest reliability. Trip is one of the most disrupting events that reduces GT availability and increases maintenance costs. To tackle the challenge of GT trip prediction, this paper presents a methodology that has the goal of monitoring the early warnings raised during GT operation and trigger an alert to avoid trip occurrence. The methodology makes use of an auto-encoder (prediction model) and a three-stage criterion (detection procedure). The auto-encoder is first trained to reconstruct safe operation data and subsequently tested on new data collected before trip occurrence. The trip detection criterion checks whether the individually tested data points should be classified as normal or anomalous (first stage), provides a warning if the anomaly score over a given time frame exceeds a threshold (second stage), and, finally, combines consecutive warnings to trigger a trip alert in advance (third stage). The methodology is applied to a real-world case study composed of a collection of trips, of which the causes may be different, gathered from various GTs in operation during several years. Historical observations of gas path measurements taken during three days of GT operation before trip occurrence are employed for the analysis. Once optimally tuned, the methodology provides a trip alert with a reliability equal to 75% at least 10 h in advance before trip occurrence.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4295217
    Collections
    • Journal of Engineering for Gas Turbines and Power

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV