Show simple item record

dc.contributor.authorBen-Haim, Yakov
dc.contributor.authorCogan, Scott
dc.date.accessioned2023-11-29T19:38:14Z
dc.date.available2023-11-29T19:38:14Z
dc.date.copyright6/6/2023 12:00:00 AM
dc.date.issued6/6/2023 12:00:00 AM
dc.date.issued2023-06-06
dc.identifier.issn2332-9017
dc.identifier.otherrisk_009_03_031203.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4294917
dc.description.abstractEngineering design and technological risk assessment both entail learning or discovering new knowledge. Optimal learning is a procedure whereby new knowledge is obtained while minimizing some specific measure of effort (e.g., time or money expended). A paradox is a statement that appears self-contradictory, contrary to common sense, or simply wrong, and yet might be true. The paradox of optimal learning is the assertion that a learning procedure cannot be optimized a priori—when designing the procedure—if the procedure depends on knowledge that the learning itself is intended to obtain. This is called a reflexive learning procedure. Many learning procedures can be optimized a priori. However, a priori optimization of a reflexive learning procedure is (usually) not possible. Most (but not all) reflexive learning procedures cannot be optimized without repeatedly implementing the procedure which may be very expensive. We discuss the prevalence of reflexive learning and present examples of the paradox. We also characterize those situations in which a reflexive learning procedure can be optimized. We discuss a response to the paradox (when it holds) based on the concept of robustness to uncertainty as developed in info-gap decision theory. We explain that maximizing the robustness is complementary to—but distinct from—minimizing a measure of effort of the learning procedure.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleParadox of Optimal Learning: An Info-Gap Perspective
dc.typeJournal Paper
dc.journal.volume9
dc.journal.issue3
dc.journal.titleASCE-ASME J Risk and Uncert in Engrg Sys Part B Mech Engrg
dc.identifier.doi10.1115/1.4062511
dc.journal.fristpage31203-1
dc.journal.lastpage31203-12
dc.page12
dc.treeASCE-ASME J Risk and Uncert in Engrg Sys Part B Mech Engrg:;2023:;volume( 009 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record