Show simple item record

dc.contributor.authorYulei Xu
dc.contributor.authorBin Xu
dc.contributor.authorJinzhou Song
dc.contributor.authorZhengbing Li
dc.contributor.authorYi Guo
dc.contributor.authorRenfu Tu
dc.contributor.authorYongtu Liang
dc.contributor.authorHongyang Gao
dc.contributor.authorHengyu Wang
dc.date.accessioned2023-11-28T00:10:14Z
dc.date.available2023-11-28T00:10:14Z
dc.date.issued6/22/2023 12:00:00 AM
dc.date.issued2023-06-22
dc.identifier.otherJPSEA2.PSENG-1451.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4294085
dc.description.abstractBatch interface tracking and contamination control are the key technologies for the operation and management of multiproduct pipelines. Existing studies only focused on sequence arrangement or segment stoppage to control the generated contamination, and few considered this problem comprehensively and systematically. This study fully considers the contamination control process and develops a scheduling model for straight pipelines to minimize the cost of contamination loss caused by segment stoppage. The objective of this model is to minimize the restart cost of idle segments and the penalty cost due to improper interface placement during segment stoppage. Three types of constraints for contamination control are proposed, namely operation control, flow rate control, and stoppage control. Three real-world multiproduct pipelines are used as examples to validate the proposed method. Compared with the actual operation schemes, the method helps to reduce the number of stoppage operations by 20%–50%, and decrease the probability that the interface is improperly located by 40%–67%. Therefore, this work can reduce the cost of contamination treatment and bring greater benefits to pipeline operators.
dc.publisherASCE
dc.titleScheduling of Straight Multiproduct Pipelines Considering the Contamination Control
dc.typeJournal Article
dc.journal.volume14
dc.journal.issue4
dc.journal.titleJournal of Pipeline Systems Engineering and Practice
dc.identifier.doi10.1061/JPSEA2.PSENG-1451
dc.journal.fristpage04023027-1
dc.journal.lastpage04023027-19
dc.page19
dc.treeJournal of Pipeline Systems Engineering and Practice:;2023:;Volume ( 014 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record