• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Comparing Subjective and Objective Measurements of Contract Complexity in Influencing Construction Project Performance: Survey versus Machine Learning

    Thumbnail
    View/Open
    JMENEA.MEENG-5331.pdf (294.3Kb)
    Date
    2023/07/01
    Author
    Lihan Zhang
    Hongjiang Yao
    Yongcheng Fu
    Yongqiang Chen
    Metadata
    Show full item record
    Abstract
    Contracts are the main governance mechanism regulating construction participants’ behaviors and safeguarding project performance. Besides traditional subjective measurement via survey, machine learning has been utilized as a more objective method to measure contract complexity in the field of construction management. However, little is known about whether misalignment between these two measurements exists and whether their impact on project performance differs. To answer these questions, we collected 202 pairs of construction contracts and questionnaires. Construction contracts were analyzed by machine learning to obtain the objective measurement of contract complexity, whereas questionnaires provided the subjective measurement. Through a multifunctional perspective of contracts, we found that the two measures are positively correlated with each other for contractual coordination and adaptation but nonsignificant for control. Regarding the ongoing debate on the relationship between contract complexity and trust, we selected trust as another antecedent of construction project performance. The results showed that trust is only positively related to the subjective measurement of contract complexity, which has a direct impact on project performance. In contrast, the objective measurement strengthens the positive effect of trust on project performance. Theoretically, our study contributes to construction contract research by highlighting that different measures cannot be used interchangeably and that scholars should be aware of the measurement issue when conducting and assessing relevant research. Practically, construction project managers are provided with guidance on performance improvement through perspectives from both objective design and subjective perceptions of contracts.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293091
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV