    System Dynamics as an Assistive Tool to Delay Analysis in Identifying Productivity Losses

    Thumbnail
    View/Open
    JLADAH.LADR-948.pdf (716.0Kb)
    Date
    2023/08/01
    Author
    Shrouk Gharib
    Ossama Hosny
    Ahmed Waly
    Ibrahim Abotaleb
    Metadata
    Show full item record
    Abstract
    It is well established in the construction literature that change orders have negative impacts on project productivity. Such impacts have been measured through statistical models and data gathered from a large number of projects, which enables drawing conclusions on a broad level. However, there is a gap when it comes to modeling the relationships between change orders and construction productivity on the project level. This paper proposes a novel framework using system dynamics (SD) modeling to complement current delay analysis techniques in quantifying the impacts of owners’ change orders on project productivity. SD was used as the modeling tool for its ability in capturing rippled impacts and model complex systems. The research methodology (1) identifies the exogenous and endogenous parameters, (2) develops a dynamic hypothesis that guides model formulation, (3) develops the SD model along with its mathematical formulation, (4) runs verification tests, and (5) calibrates the model and tests it on a real case study. The developed model captures the typical construction cycle and can quantify the impact of each change order separately. In addition, after calibrating the model to any project, multiple what-if scenarios are conducted to provide further insights on allocating delay responsibilities. This model can identify the delays caused due to change orders that can be helpful for both contractors and owners to resolve the corresponding claims prior to escalation to disputes.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4292890
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV