• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Compatibility of Dispute Resolution with Power Distance in the Construction Industry: A Perspective Based on the Statutory Adjudication Regime

    Thumbnail
    View/Open
    JLADAH.LADR-886.pdf (190.0Kb)
    Date
    2023/05/01
    Author
    Farrah Azwanee Aminuddin
    Nur Emma Mustaffa
    Metadata
    Show full item record
    Abstract
    Recognizing the importance of cash flow in construction, the Malaysian government has introduced the Construction Industry Payment and Adjudication Act 2012 (CIPAA), which represents a significant development to improve cash flow and payment disputes. Power distance is a national culture dimension that measures the extent to which less powerful members of the country expect and accept that power is unequally distributed. Malaysia scores very high on power distance dimension, which indicates people accept a hierarchical order that needs no further justification. The introduction of yet another form of adversarial dispute resolution like adjudication raises the question of cultural compatibility between dispute resolution and the society’s power distance. The purpose of this paper is to assess the compatibility of power distance on dispute resolution through a qualitative study from the perspective of CIPAA. The research draws data from 15 semistructured interviews. Through thematic analysis, data were coded and categorized to support the inquiry. Patterns from the data illustrated that adversarial dispute resolution like adjudication is found to be less desirable to the Malaysian construction industry because it creates social frictions to the hierarchy values embedded within a high power value society. The study presents an analysis of a result that power struggle is a problem to a successful dispute resolution process in a high power distance society. It is hoped that the finding will foster awareness of societal implications among policy makers when implementing dispute resolution mechanisms.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4292869
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV