    Disputes and Claim Management during the COVID-19 Crisis: The Lessons Learned

    Thumbnail
    View/Open
    JLADAH.LADR-843.pdf (611.1Kb)
    Date
    2023/02/01
    Author
    AbdulLateef Olanrewaju
    Paul Junior Anavhe
    Hui Chen Chu
    Metadata
    Show full item record
    Abstract
    The COVID-19 crisis has presented the construction sector with challenges that the world has never seen before. Productivity is down, costs have increased, conflicts and claims are increasing, delays are high, health and safety practices are increasing, and profit margins have been reduced. The challenges require unprecedented, sudden, and unplanned changes to construction management practices and strategies. Through an open-ended survey questionnaire, this research investigated how COVID-19 causes disputes in construction projects and the measures that quantity surveying firms take to resolve the disputes in construction contracts due to the pandemic. The data revealed that disputes and claims have increased by some 80% due to the COVID-19 pandemic. In addition, the data revealed that the COVID-19 pandemic has increased project costs by more than 40%. Shortages of materials, compliance with standard operating procedures, social distance, fluctuation, and shortages of labor are the causes of disputes. Unlike prior to the COVID-19 crisis, disputes are not caused by variations, ambiguous contract clauses, mistakes, errors, and competencies of the parties to the contracts. To resolve COVID-19-induced claims, contract clauses, negotiations, conciliation, trust management, and contingency provisions are the most effective. This research provides new information on claim management during a crisis. From an ontological standpoint, the main findings of this study are generalizable to construction projects in and outside of Nigeria.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4292861
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV