• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Cost Optimization and Energy Management of a Microgrid Including Renewable Energy Resources and Electric Vehicles

    Thumbnail
    View/Open
    jert_145_4_042101.pdf (1.427Mb)
    Date
    2022
    Author
    Hai, Tao
    Zhou, Jincheng
    Zain, Jasni Mohamad
    Vafa, Saeid
    Metadata
    Show full item record
    Abstract
    Penetration of plug-in hybrid electric vehicles (PHEVs) is capable of alleviating numerous global environmental and energy challenges. Utilization of a significant number of PHEVs with significant capacity and control capabilities can increase electrical grid flexibility. However, optimum management of such vehicles with renewable energy sources (RESs) would be one of the primary difficulties needing to be investigated. In the form of a microgrid, the operation of substantial RESs’ and PHEVs’ penetration would be achieved when operating within a microgrid. The problem has been formulated and approached as a single-objective optimization model aiming to minimize the total cost of the grid-tied MG. The converged barnacles mating optimizer (CBMO) algorithm is deployed to tackle the problem. The derived results verify the desired performance of the method compared to well-established ones. In scenario 1, the CBMO method determines the MG operating costs that are lower than those given by some well-established methods including the genetic algorithm (GA), imperialist competitive algorithm (ICA), and particle swarm optimization (PSO). The cost computed by the CBMO is 263.632 €ct/day. Likewise, the values of cost for scenarios 2 and 3 utilizing the hybrid CBMO method are 300.1364 €ct/day and 336.2154 €ct/day, respectively. The findings confirm the usefulness of the proposed CBMO algorithm with an excellent convergence rate. Comparing the average solution time of the CBMO algorithm with those provided by other algorithms reveals the excellent performance of the CBMO method. The obtained results indicate that the mean simulation time of the suggested CBMO approach in the first case is 5.19 s, whereas the time required by the GA, PSO, and ICA is 12.92 s, 10.73 s, and 7.27 s, respectively.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4292124
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV