• Login
    View Item 
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    •   DSpace Home
    • AMS
    • Weather and Forecasting
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Forecast Skill of Tropical Cyclone Genesis in Two Global Ensembles

    Thumbnail
    View/Open
    WAF-D-22-0145.1.pdf (2.404Mb)
    Date
    2022
    Author
    Xiping Zhang
    Juan Fang
    Zifeng Yu
    Metadata
    Show full item record
    Abstract
    Tropical cyclone (TC) genesis forecasts during 2018–20 from two operational global ensemble prediction systems (EPSs) are evaluated over three basins in this study. The two ensembles are from the European Centre for Medium-Range Weather Forecasts (ECMWF-EPS) and the MetOffice in the United Kingdom (UKMO-EPS). The three basins include the northwest Pacific, northeast Pacific, and the North Atlantic. It is found that the ensemble members in each EPS show a good level of agreement in forecast skill, but their forecasts are complementary. Probability of detection (POD) can be doubled by taking all the member forecasts in the EPS into account. Even if an ensemble member does not make a hit forecast, it may predict the presence of cyclonic vortices. Statistically, a hit forecast has more nearby disturbance forecasts in the ensemble than a false alarm. Based on the above analysis, we grouped the nearby forecasts at each model initialization time to define ensemble genesis forecasts, and verified these forecasts to represent the performance of the ensemble system. The PODs are found to be more than twice that of the individual ensemble members at most lead times, which is about 59% and 38% at the 5-day lead time in UKMO-EPS and ECMWF-EPS, respectively; while the success ratios are smaller compared with that of the ensemble members. In addition, predictability differs in different basins, and genesis events in the North Atlantic basin are the most difficult to forecast in EPS, and its POD at the 5-day lead time is only 46% and 23% in UKMO-EPS and ECMWF-EPS, respectively.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4290244
    Collections
    • Weather and Forecasting

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV