• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Research on the Implementation of a Commercial Bank’s Digital Transformation Business in the Investment and Financing of Highway Transportation Clean Energy Facility Construction

    Thumbnail
    View/Open
    JHTRCQ.0000826.pdf (599.7Kb)
    Date
    2022/06/01
    Author
    Qi-yuan Chen
    Hui-yi Liao
    Metadata
    Show full item record
    Abstract
    In the context of carbon peaking and carbon neutrality policy, the promotion of highway transportation clean energy facility construction is urgently needed. This paper suggests that a new business model can be applied to solve the financing problem in this field which is referred to as “DTBB”. The paper first gives the definition of the DTBB business. In the DTBB business, commercial banks provide favorable financing for highway transportation clean energy facility construction projects. In exchange, future cash flow generated by the projects will be deposited into commercial banks. Using a mathematical model, this paper then gives the theoretical value of DTBB in providing funds for the construction of clean energy facilities in highway transportation. The theoretical model suggests that the ability to provide funds is proportional to the cash flow generated by the highway transportation clean energy facility construction projects for DTBB. The risk of DTBB will gradually decrease with the growing number of similar businesses carried out by commercial banks. This paper follows a case study design, with in-depth research on a wireless charging highway project and a hydrogen refueling station in the future. The results show that (1) the theoretical value of DTBB is about 15.7% of the total initial investment of the hydrogen refueling station project when the discounting rate of the project is 0.1 and the lifetime of the project is 15 years, and (2) the theoretical value of DTBB is about 1.4% of the total initial investment of the wireless charging highway project when discounting rate of the project is 0.1 and the lifetime of the project is 15 years.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289466
    Collections
    • Journal of Highway and Transportation Research and Development (English Edition)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV