• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Liability of Designers to Contractors for Proposal-Related Claims in Design-Build Contracts

    Thumbnail
    View/Open
    %28ASCE%29LA.1943-4170.0000555.pdf (211.7Kb)
    Date
    2022/11/01
    Author
    Michael C. Loulakis
    Douglas D. Gransberg
    Metadata
    Show full item record
    Abstract
    Design-build (DB) project proposals generally require the designer on the DB team to advance the level of design provided by the owner in the request for proposals (RFP) to a stage where a firm fixed price can be proposed. The construction contractor on the team uses the designer’s work product to prepare the proposed bid price. Issues can arise if there are errors in the proposal designs that cause the contractor to spend more money than planned. The standards for determining a designer’s liability for errors in completed, signed, and sealed design documents are well understood. However, the standards for determining a designer’s liability to contractors for errors in proposal designs are neither clear nor well understood. This paper reviews several published cases addressing disputes between contractors and designers with respect to design errors arising from these proposal-based designs. It concludes that the question of whether a contractor can recover losses due to errors found in proposal-related design documents is largely dependent on what the agreement for proposal-related services provides as a standard of care and whether the contractor can adequately demonstrate that the losses are attributable to the proposal-related errors. This paper provides several recommendations on what issues should be covered when contractors and designers enter into a teaming agreement or other contract for proposal-related services.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289271
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV