• Login
    View Item 
    •   DSpace Home
    • ASME
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
    • View Item
    •   DSpace Home
    • ASME
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    New Regulatory Instrument for Brazilian Decommissioning of Oil and Gas Installations

    Thumbnail
    View/Open
    risk_008_04_044501.pdf (98.39Kb)
    Date
    2022
    Author
    de Souza, Karen Alves;Barbosa, Ludmyla Carolina Mariano;Jacques, Tiago Machado de Souza;Bourbon, Vitor José Campos
    Metadata
    Show full item record
    Abstract
    The Brazilian decommissioning industry faces challenges in the onshore and offshore environments that could potentially lead to operational safety problems and environmental impacts. In 2020, the Brazilian regulators brought innovations to the decommissioning plans, implementing a new resolution. On the economic aspect, this instrument aims to promote the sector's business conditions and to have it adapted to recognized internationally decom technical standards. On the regulatory side, it aims to compare alternative solutions for decommissioning facilities adopting at least technical, environmental, social, safety, and economic criteria. The existing framework was discussed with different stakeholders, involving industry, society, and academics. Several improvements and opportunities for the sector were identified, suggesting the necessity of improving the local decom infrastructure and technological enhancements to extend the lifecycle of fields. The adoption of Conceptual Installation decommissioning program (IDP) and Executive IDP by the resolution allowed the operator to determine the general lines of actions related to the decommissioning, allowing better planning, and reducing project uncertainties. As seen, the IDP requires the consideration of a multicriteria analysis and the need to be cautionary. The Conceptual IDP ensures a better field development and the best decommissioning planning in initial stages. The new resolution established welldefined rules aimed at field life extension and the recovery factor, lowering costs, and preventing premature decommissioning of the field in a safe manner, minimizing risks to people and the environment, in addition to establishing that the operator must evaluate the possibility of using the asset for another purposes.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4288899
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV