• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation–Driven Approach

    Thumbnail
    View/Open
    (ASCE)ME.1943-5479.0001090.pdf (3.647Mb)
    Date
    2022/11/01
    Author
    Tamima S. Elbashbishy
    Ossama A. Hosny
    Ahmed F. Waly
    Elkhayam M. Dorra
    Metadata
    Show full item record
    Abstract
    The lack of effective and comprehensive risk identification leads to ineffective risk management, which accordingly leads to failure in achieving project goals. Previous research efforts related to simulating risks in construction projects mostly have been limited to viewing risks as segregated factors, and thus providing static analysis. This paper addressed this knowledge gap through a risk path simulation–driven approach that addresses construction risks as a continuum of risk sources, events, and project characteristics. The authors (1) identified 131 construction project risks by conducting an extensive literature review, (2) designed a risk path by analyzing risk paths available in the literature, capitalizing on identified benefits, and avoiding drawbacks, (3) conducted a project-based survey to collect data from 53 construction projects related to the magnitude and impact of occurrence of the identified risks on cost overruns, (4) developed a series of two genetic algorithm (GA) models and one artificial neural network (ANN) model to quantify the impact of construction risks on cost overruns, and (5) created an ontology model to facilitate data structuring and retrieval. An ontology is a data modeling tool used to represent unstructured information into structured forms. Results show that 80% of the risks identified in this research were found to have a significant impact on cost overruns, and 89% can be recognized at project initiation. The contribution of this framework lies in its ability to represent the cost impact of a chain of conditions and events, rather than a single-point risk factor using GA and ANN modeling techniques. The proposed framework may help industry practitioners assess the impact of significant construction risks on cost overruns.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4287759
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV