    Postaward Construction and Contract Management of Engineering, Procurement, and Construction Hydropower Projects: Two Case Studies from Uganda

    Thumbnail
    View/Open
    (ASCE)ME.1943-5479.0001088.pdf (960.5Kb)
    Date
    2022/11/01
    Author
    Harrison E. Mutikanga
    Mohamad Abdul Nabi
    Gasser G. Ali
    Islam H. El-adaway
    Aubrie Caldwell
    Metadata
    Show full item record
    Abstract
    The current economic and infrastructural growth in developing countries has triggered the use of multiple forms of alternative contracting methods (ACMs)—including engineering, procurement, and construction (EPC)—in various public sector projects. However, the relative lack of in-depth experience in using EPC contracting methods among public agencies has presented numerous problems. To this end, the goal of this research is to identify the broad postaward construction and contract management (PA-CCM) challenges associated with EPC projects in developing countries using two major infrastructure hydropower projects in Uganda as case studies. A systematic literature review was first conducted to establish a preliminary list of challenges. Afterward, case study data were collected by examining project documentation, conducting site visits, and holding semistructured interviews. The results of this study offered a total of 73 PA-CCM challenges that were categorized into seven different themes. Also, 14 critical lessons learned were identified to better enable stakeholders to mitigate potential problems and promote improved performance for their EPC projects. The outcomes of this paper serve as a pivotal foundation for construction practitioners and future scholars to develop effective mitigation strategies for the challenges associated with EPC contracting methods in developing countries. This paper established a comprehensive list of postaward construction and contract management challenges related to engineering, procurement, and construction projects in developing countries. The presented challenges are extracted based on two project case studies and cross-validated with the current literature. Ultimately, lessons learned for industry practitioners to mitigate the key postaward construction and contract management challenges are devised. The outcomes of this paper provide a solid basis for industry practitioners to identify the various postaward construction and contract management challenges in engineering, procurement, and construction projects and subsequently promote effective implementation and enhanced project performance. The latter is achieved by considering the lessons learned and recommendations offered by this paper during the early stages of the project and before the contract award.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4287756
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV