• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Automated Components–Vehicle Allocation Planning for Precast Concrete Projects

    Thumbnail
    View/Open
    (ASCE)ME.1943-5479.0001086.pdf (491.0Kb)
    Date
    2022/11/01
    Author
    Jun Young Jang
    Jung In Kim
    Choongwan Koo
    Tae Wan Kim
    Metadata
    Show full item record
    Abstract
    To move precast concrete (PC) components to the site through vehicles in a PC project, a construction manager must establish a PC components–vehicle allocation (CVA) plan everyday by integrating factory, transport, and site information and by reflecting various considerations for CVA. However, in practice, the manager establishes the plan manually, which often leads to an increase in transportation costs due to inefficient use of vehicles and plan errors. Thus, this study develops an automated method for CVA by deriving considerations for CVA via interviews and literature review and by formalizing a CVA process that satisfies the considerations. The process has the following five steps: determining component loading type, developing preliminary CVA, determining vehicle loading type, crashing CVA for reducing the number of vehicles, and setting site arrival time and type of vehicles. Charrette test results indicate that the automated method can generate CVA plans faster than practitioners and reduce the number of vehicles by taking the derived considerations into account comprehensively. This study contributes to the off-site construction management theory by formalizing the process knowledge about how to deal with different considerations in CVA. This can help alleviate social and environmental problems, such as increased transportation cost and carbon dioxides emission by supporting decision-making of construction managers in planning installation of PC components and allocating them to vehicles.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4287754
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV