• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Transportation Engineering, Part B: Pavements
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Transportation Engineering, Part B: Pavements
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A Modified CLSM Trench Backfilling Method to Provide Immediate Bearing Capacity

    Thumbnail
    View/Open
    JPEODX.0000379.pdf (4.408Mb)
    Date
    2022/05/11
    Author
    Dofran Winner Luhulima
    Hung-Jiun Liao
    Yi-Ying Tsai
    Metadata
    Show full item record
    Abstract
    The use of controlled low-strength material (CLSM) to backfill the cut-and-cover pipelines trench under busy streets is getting popular nowadays. Due to the slow hydration rate of cement in CLSM, extra waiting hours are usually needed before it can develop sufficient strength to sustain traffic. To shorten the waiting time, this paper presents a method that can provide a good immediate bearing capacity for the CLSM backfilled trench right after completing narrow trench work. This modified method adds extra gravel to the top of the fresh CLSM, which is already in the trench. The gravel is then pushed down and mixed with CLSM and forms a strong upper layer for the CLSM trench. It can provide a good immediate bearing capacity to endure traffic weight. To verify the suitability of this modified CLSM trench filling method, a numerical analysis method [discrete-element method (DEM)] was adopted in this study, along with the laboratory model and field tests. The DEM results showed that high-friction material (gravel) on the upper portion of the trench could form a strong layer that sustains a large share of the surcharge load. So, it could result in a significant pressure reduction for the lower portion of the trench and around the buried pipes, even though the CLSM had not hardened yet. Such a result was confirmed by the laboratory model test and the full-scale field test, in which it showed an increase in the initial load-bearing capacity and a much smaller settlement on the surface of the CLSM backfilled trench.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286850
    Collections
    • Journal of Transportation Engineering, Part B: Pavements

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV