Show simple item record

dc.contributor.authorYaming Xu
dc.contributor.authorPai Pan
dc.contributor.authorCheng Xing
dc.date.accessioned2022-08-18T12:31:20Z
dc.date.available2022-08-18T12:31:20Z
dc.date.issued2022/04/29
dc.identifier.other%28ASCE%29SU.1943-5428.0000400.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286748
dc.description.abstractThe prediction of dam settlement data plays an important role in analyzing whether the dam is in a safe operation state. But in the field of surveying engineering, the original data measured by instruments will inevitably have random and unpredictable random errors, and the settlement of dams usually has a strong correlation with environmental parameters. In this study, the influence of random error and environmental parameters on dam settlement prediction is discussed, and a prediction model based on multi-input long short-term memory (LSTM) network and random error extraction is proposed. Through the settlement data of a concrete face rockfill dam, the analysis shows that removing random errors can significantly improve the short-term prediction performance and considering environmental parameters can significantly improve the long-term prediction performance. In addition, through comparison and generalization experiments, this method not only has higher prediction accuracy, but also can be applied to other surveying and mapping engineering fields.
dc.publisherASCE
dc.titleDam Settlement Prediction Based on Random Error Extraction and Multi-Input LSTM Network
dc.typeJournal Article
dc.journal.volume148
dc.journal.issue3
dc.journal.titleJournal of Surveying Engineering
dc.identifier.doi10.1061/(ASCE)SU.1943-5428.0000400
dc.journal.fristpage04022006
dc.journal.lastpage04022006-17
dc.page17
dc.treeJournal of Surveying Engineering:;2022:;Volume ( 148 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record