• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Simulating Competitive Bidding in Construction Collusive Bidding Cases

    Thumbnail
    View/Open
    %28ASCE%29ME.1943-5479.0001081.pdf (642.4Kb)
    Date
    2022/07/06
    Author
    Jae-Seob Lee
    Metadata
    Show full item record
    Abstract
    Collusive bidding is regarded as one of the most socially harmful, anticompetitive, and illegal practices in the construction sector. Bid-rigging, which is a form of collusion, refers to the process in which several bidders illegally form a consortium to fix the winner of the bid. Bid-rigging, also referred to as collusive tendering, occurs when two or more competitors agree they will not compete genuinely with each other for tenders, allowing one of the cartel members to win the tender. Bid-rigging results in economic harm to the owner that is seeking the bids, and to the public. An analysis of economic harm due to bid-rigging is intended to demonstrate that the realized price in bid-rigging is an overestimate of the price that bids would have fetched in the absence of collusion. However, in civil antitrust litigation concerning bid-rigging, proof of injury-in-fact and damages have often been the most troublesome elements. Thus, simulating competitive bidding is essential in bid-rigging damages estimation, because the amount of overcharge suffered requires an estimate of what the winning bids would have been if true competitive bidding had occurred. However, simulation models for forecasting the damages due to bid-rigging, especially in design–bid–build (DBB) contracts in the construction management literature, are very scarce. In this paper, a statistical simulation model is proposed for predicting the damage due to bid-rigging in DBB contracts, based on decision-making theory. This empirical study suggests that, for projects with rigged bids, the model simulates competitive bids that are close to the actual competitive bidding environment. The model is validated with an actual bid-rigging case collected from the Korean construction industry. The empirical evidence collected in this study on the possible damages due to bid-rigging provides valuable insight into the challenges faced by the construction industry. The study’s result expands upon competitive bidding theory by developing a process to simulate what the optimal bidding strategy would be in the absence of collusion, to predict the damage due to bid-rigging in DBB construction contracts.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286477
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV