• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Machine Learning–Driven Model to Analyze Particular Conditions of Contracts: A Multifunctional and Risk Perspective

    Thumbnail
    View/Open
    %28ASCE%29ME.1943-5479.0001068.pdf (346.4Kb)
    Date
    2022/05/23
    Author
    Jianxiong Yang
    Yongqiang Chen
    Hongjiang Yao
    Bingxin Zhang
    Metadata
    Show full item record
    Abstract
    Contracts can serve three functions—Control, Coordination, and Adaptation—to mitigate different risks. This multifunctional perspective based on the development of contract theory has been introduced in construction industries to analyze how general conditions of contracts deal with risks. However, the particular conditions of contracts present specific requirements closely related to projects, which can generate additional risks for both parties. To fill in the gap, this study analyzes nine particular conditions from nine projects with good performance respectively based on the Fédération Internationale Des Ingénieurs-Conseils (FIDIC) 1999 Silver Book and explores what aspects good particular conditions focus more on to avert risks when modifying the general conditions. We built machine learning–based classification models to conduct a content analysis of complete contracts (containing both general conditions and particular conditions) to measure the functions of contracts. The optimal model was proved to be acceptable and then used for efficiently coding more particular conditions of the FIDIC 1999 Silver Book. The results indicate that good particular conditions roughly follow the functional distribution of general conditions and no significant difference is found in functional distribution between a whole complete contract and its underlying general conditions. It also suggests minor revisions should be made to the Adaptation function, and particular conditions should concentrate more on explicitly illustrating both parties’ obligations and tasks prudently to mitigate potential risks. These findings can practically assist contract managers to analyze particular conditions and identify the potential risks.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286463
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV