• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Assessing Safety Risk Management Performance in Chinese Subway Construction Projects: A Multistakeholder Perspective

    Thumbnail
    View/Open
    %28ASCE%29ME.1943-5479.0001062.pdf (1.129Mb)
    Date
    2022/04/30
    Author
    Shang Zhang
    Martin Loosemore
    Riza Yosia Sunindijo
    Shane Galvin
    Jin Wu
    Suyuan Zhang
    Metadata
    Show full item record
    Abstract
    The rapid development of subway projects in China presents significant safety risks to those involved. Building on the previous empirical research that identified and classified the safety risks of these projects, the aim of this paper is to assess the safety risk management performance in Chinese subway construction projects from a multistakeholder perspective. Questionnaire surveys and semistructured interviews were conducted with three hundred and ninety-nine and eight construction professionals, respectively, who worked on subway construction projects in southeast China. The results indicate that the top five areas of safety risk management performance are related to construction plan development, management of high-risk construction works, hazard identification and communication, government-related factors, and client-related factors. In contrast, the bottom five areas of safety risk management performance are related to engineering consultant-related factors, the site’s natural environment and weather conditions, regular tests, machine calibration and maintenance, site construction schedule, and construction preparedness. The relationship between this safety risk management performance and the perceived importance of each risk factor is also reported, identifying priority areas for improvements on these projects. These findings contribute new conceptual insights to the paucity of research on the safety risk management performance of Chinese subway construction projects from a multistakeholder perspective. The results also provide new practical insights for policymakers and project managers to help them develop more effective and focused strategies to further improve the safety performance of these major projects.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286457
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV