Show simple item record

dc.contributor.authorYan Ning
dc.contributor.authorYoung Hoon Kwak
dc.date.accessioned2022-08-18T12:20:10Z
dc.date.available2022-08-18T12:20:10Z
dc.date.issued2022/04/22
dc.identifier.other%28ASCE%29ME.1943-5479.0001046.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286449
dc.description.abstractProject-based firms (PBFs) have to sense and seize new project opportunities by dynamically adapting and reconfiguring resources and activities to survive in the fast and highly competitive business environment. Yet, it is inconclusive on how project experience alters the way of responding to the vibrant environment. Grounded on the dynamic capabilities theory, this study aims to examine how consulting firms with different project experience configures dynamic capabilities to be competitive. To do so, this study first reviews the literature on dynamic capabilities applied to project management, followed by a questionnaire survey and case studies to better comprehend how PBFs with varying project experience use their dynamic capabilities. Fuzzy-set qualitative comparative analysis (fsQCA) was employed to analyze the questionnaire-survey data. Drawing on dynamic capabilities theory, the dynamic capabilities of PBFs are conceptualized as a four dimension framework, comprising project opportunity sensing, external integrating, internal coordinating, and project-based learning. The empirical results show that PBFs with richer experience would less rely on project opportunity sensing but still have to commit to external integrating, internal coordinating, and project-based learning. This study contributes to the body of knowledge of applying the dynamic capabilities concept to project management to understand how PBFs position themselves in the fast-changing environment.
dc.publisherASCE
dc.titleHow Do Consulting Firms with Different Project Experience Configure Dynamic Capabilities?
dc.typeJournal Article
dc.journal.volume38
dc.journal.issue4
dc.journal.titleJournal of Management in Engineering
dc.identifier.doi10.1061/(ASCE)ME.1943-5479.0001046
dc.journal.fristpage04022029
dc.journal.lastpage04022029-13
dc.page13
dc.treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record